I have been spending the better part of my weekends for the last few months on a 'garage re-do'. I didn't take any before pictures, but basically it was taped and mudded drywall with pine shelves on the back wall. Here is what I did:
- Fixed a major drywall area (pipe behind it froze)
- Make other minor drywal repairs
- Texture, walls and ceiling
- Prime and paint walls (to match floor) ceiling (white) and foundation
- Added 12 4' two bulb T8 fixtures
- Cabinets
- Race Deck flooring
- Take care of wiring and cable mess (visible in picturue)
- Lights over workbench
- Finish flooring around step, furnace , HW heater (done after this pic was taken)
- Get everthing put in its new home. Detailing supplies in the first big cabinet (at least!)
Comment